Question About Inspections

I have an older home (100 yrs) and I would like to upgrade the 100 amp service to 200. My question is when it comes time for the inspector to visit and inspect the new work, could the original wiring of the house be part of the inspection and result in a "fail" of the inspection.

To elaberate, the old wiring is romex and BX yet in the basement it is not run very neat and I see many places where I would add a staple or three. Some of the junction boxes don't have covers etc. Basicly fairly messy.
      


Similar Tutorials

How to Lay Sod - The Right Way!
   - Make sure the green side faces up! And, there are a few more steps if you want to ensure a nice looking lawn. Prepa ...
The Difference Between Volts, Amps, and Watts
   - This article explains the difference between Volts, Amps, and Watts in an easy-to-understand non-scientific way. T ...
Water is Leaking from the Toilet – What do I do? (How to replace the wax seal for a toilet.)
   - If there is water leaking from the toilet, you need to make sure that you know from where the water is leaking. Che ...


Similar Topics From Forums

I'm preparing for finally calling in for my rough in inspection and was hoping I could get a checklist or at least some suggestions as to what work should and should not be completed for a rough-in inspection.  Does any wiring need to be spliced, wire-nutted, terminated within the panel or lighting or receptacle boxes?  My project was running power from main panel to lug and from lug to sub in detached res. garage and installing 4-5 lighting and recep circuits.
      
I have a 1960s house with EMT throughout. 



I recently replaced 2 florecent fixtures in my basement with 4 LED lights in their own J-Boxes in the drop ceiling. I did the following:



1. Rerouted the the conduit from the light switch to the main j-box for the lights. (previously it was going directly into the fixture) 

2. Ran 4 foot whips to each jbox holding the LED (metalic 14# wires)

3. Cut the old spliced wire (that was just twisted and taped) and used a wire nut

4. Replaced the switch with a dimmer



The lights work great.  Noticebale improvement and the dimmer is excellent.



The issue is that the circuit for the kitchen is now tripping.  I told my wife its just a coincidence, but she is sure I caused it.  Its only happened 2x (1 day apart.  Nothing unusual running on the circuit, only the fridge and the gas stove which as not in use)



Can my "new" work possibly impact another circuit?   What should I check?  Any way to avoid re-doing my work?



Things I noticed / may or may not be relevant:

1. Some of the EMT is directly in contact with a copper water pipe

2. The switch / dimmer isn't grounded

3. The wires in the jbox were nasty and old.  There was corrosion on the jackets and the jbox.  Looks like some water leaked down fromt the laundy above at some point in the last 40 years.

4. At some point (months ago) when I was in the basement I touched some of the EMT and something that was plugged in I swear I feld a shock. (just listing everything I can think of).  I didn't think much of it at the time, but now my whole electrical system is suspect.

5.  The tripped circuit (fridge, MW, stove) didn't appear to be tripped.  The fridge wasn't on.  When I turned off and back on the circuit the aplliances came back to life.  Appliances less than 1 year old. 

6. The clock on the range was reset at one point but I didn't think I turned on or off the circuit.  The lights for the basement were switced off but still worked with the fridge circuit tripped.

7.  We had a huge electrical storm right before I did the work

8.  We have a "stablock" panel that the home inspector got all bent out of shape about.  Other than truning on and off breakers I have never touched it.

9.  Kitchen breaker and basement light breaker are adjacent in the box

10.  I believe kitchen and basement share the same EMT in places.

11.  I think I now have too many connectors in my j-box.  Will likely add an extension.

12.  I didn't use the red "bushing" on all my whips as I ran out of them, but I was careful with the metal sheath and really don't think any wires were cut. (besides if there was a short wouldn't my LED lights fail and that circut break?)



HELP.  I am happy to call a contractor to come in, but I don't have an electrician I trust yet and I'm scared bringing someone in before I isolate the problem a little.
      
Appreciate any help with this.



Background:



- new to us old house, got three quotes for an upgrade to 200A service plus addition of three new circuits in conduit with receptacles (Chicago area, conduit is code in just about every town around, I have no issue with that);



- existing service to house was overhead, opted to keep it overhead and not bury it;



- the quote says, exactly: "Installation of a 200 amp 240 volt overhead electric service complete with riser, outdoor meter socket with a 200 amp disconnect, 40 position circuit breaker type distribution panel..." etc.;



I understood from discussing the work with the contractor we chose that install overhead service meant to include the work and materials needed to upgrade the line coming from the pole at the alley to the house to handle 200A capacity; paid 50% down on quote;



- the morning the boss and tech show up for the work, boss says we already have a 200A overhead, which I seem to recall the home inspector mentioning months ago before the closing (makes sense because the overhead runs to a single room addition put on several years ago), but boss was the guy who came to the house to quote the job in the first place, didn't mention anything about the existing overhead capacity at the time;



- the work gets done, seems fine; tech left without going over anything with us but whatever.



Final bill matches the quote to the dollar. There is no indication that there were any surprises during the work.



Since the quote says installation of overhead service and they didn't need to replace the overhead lines from the pole I think the final bill should be lower than the quote. The distance from the pole to the riser is about 40 feet.



Should I expect from the wording in the quote that the final bill should be lower than the quote because they didn't have to touch the existing overhead?



About how much lower?



We didn't go with the lowest quote, didn't beat him up on price and the total bill is quite a pretty penny, so I think he would be making good money either way.



I know there is no way for someone to tell me an exact dollar figure here based on a blog post, but I'd like to get some kind of idea so I can start my conversation about the final bill.



Thanks for any help out there.
      
We had a pipe disconnect above the downstairs bathroom and the ceiling just about came down, so I decided since it was a hedious looking space, that it was a sign from the gods: Reno time!



Im now at the wiring stage. Originally there was a junction box with a light fixture out one side and a single pole switch(no ground screw...grnd wire attached to the box)on  the other. Typical set up: white from switch marked "hot" or "black" at both ends, and spliced with the incoming power's black wire. Then remaining blacks are spliced together as are the remaining whites... grounded accordingly.



What Im trying to do now is add a GFCI receptical to the mix. But Im having some trouble figuring it all out. NOTE: light fixture is not installed yet, just the wire for it with the ends capped off with a wire nut on each of the wires (Wht/Black/Grnd)



First, whats in the walls: Circuits on a 15 AMP fuse with older (but not the oldest) 12/2 wire with a blue weaved fiber outside cover. Still looks to be in great shape. I've continued using newer, yellow (Lomex or Romex?) 12/2 from homedepot as I've read that you should not mix 14 and 12 together.

All that is on the cicuit is 3 pot lights with 65w bulbs, single bulb on the stairway and what ever goes in the bathroom, so from my math, there should be plenty of room left on the circuit.



What I've tried so far:

A: I spliced the "hot"/"black" white wire from the switch to the incoming power's black, like before. Then I spliced all remaining blacks together with a wire nut, then the same with all remaining whites and then all grounds (did not attach any grnd wire to the Junction box).



Result, Nothing. After switching on the power, I tested the GFCI with a voltage tester as well as the switch and got no read.



B: Undid everything, re-spliced all like to like: all blck together, all white together..etc.



Result: Fuse trips.



Im no electrician, which I imagine is blatantly obvious from the above post, but I am following a Homedepot wiring manual, its just that what Im trying to do is not really addressed in the book... at least not directly. So I've been trying to figure it out by reading every single page, but Im still at a loss.



I've attached a very basic diagram of what is there right now. Any advice would be most appreciated.

Thanks in advance,

John
      
Hi guys. I'm Dan, and I'm in Knoxville, TN. I know running power to a shed is a very common topic here. I've been doing tons of reading and feel pretty comfortable with the requirements, but I have two questions I haven't been able to find a clear answer to.



First, my situation: I'm having a 10x16 shed built in my backyard, to be used primarily as a woodshop. I need more than a single circuit, so I know I need a subpanel and two grounding rods at least 6' apart, bonded to the subpanel with #6 bare copper wire.



My house has 200 amp service, and the main panel is in the garage at the opposite corner of the house from where the shed will go, so it would be pretty inconvenient to run a feeder from, there. But there's an existing 100 amp subpanel in the basement, presumably installed when the previous owner finished the basement. I'll be running a 60 amp feeder from that subpanel to the shed.



My total run will be something like 75', so I'm running #6 THWN for the two hots and neutral, and #10 THWN for the ground. I plan to bury it in 1.25" schedule 40 PVC, buried 18" deep.



My first question relates to how I need to run the wire when it's not underground. The basement is finished with a drop ceiling, so I plan to run the feeder across the drop ceiling, out of the house, down to the ground (it's a walk-out basement), then underground the 26' to the shed. I assume it still needs to be in conduit for at least the part that runs up the wall of the house. But what about inside, when it runs through the drop ceiling to the panel? Does it need to be in conduit for the whole run? Or would I just staple the four wires to the joists or something?



The other question relates to the trench. I've got a rain gutter downspout that discharges right at where the shed will soon be, so I'm running a 40' length of 4" PVC to pipe that water past the shed. It will be buried just about 6-12", just enough to run under the shed. Can I run the power conduit in the same trench (obviously, deeper)? Presumably I'd dig the 18" trench to the shed, lay the schedule 40, then add a few inches of dirt to bring it up to about 12" deep, and extend the trench past the shed at that depth, then lay the 4" drain pipe and backfill. Or do I need to dig two separate trenches? Is there a rule about how far apart they need to be if so?



If anyone sees any other flaws or concerns with my plan, please do speak up, I want to do this right. Thanks!



Dan
      
Hi all

I'm renovating a rental home I bought. It has the original 90 year old fuse panel  and I'd like to replace it with a modern panelboard. Here's a picture of the current setup:







I'd like to demo the inset fuse box cabinet and then mount a new panel on the wall to the left.

The service conduit goes inside the stucco into the building. I'd like to cut it, put in junction box, and a sweep and extend the service to the left to the new panel



I called our electric co. to get the power disconnected and strangely the rep told me "Oh, people usually just work on it hot". Is this true/feasible??



Your advice is appreciated
      
I'm in the process of planning to wire up two spot lights on the face of my deck as well as running an outlet (which will also be under the deck) for a LV transformer to plug in to. I will need a few junction boxes to achieve this, as well as electrical boxes for the two spot lights. I'm planning on running 12AWG THWN through some sort of conduit run along the joists to the various lighting locations and junction boxes. This will be between 3' to 8' above the surface of the ground and under roof for the most part (we built a roof over the majority of the deck as well).



So, do you recommend PVC and plastic boxes or EMC and the appropriate boxes?
      
I have a grounding question.  I am installing 400a service to my new home.  We ran 350MCM wire underground thru 3" conduit from the 2ndary terminal (moped) to the house into a 320A Cooper B-Line meter.  From the meter we ran 2 sets of 4/0-4/0-2/0 thru the wall to 2-200a breaker panels ("standard practice", according to my electrical supplier).  The ground wire (#4Cu bare) from the grounding rods comes up from the ground and we're curious if there has to be a special splice connecting the ground wire to each breaker panel or can we run thru one breaker panel to then next, say by connecting the ground wire to a ground bus on one panel and running that thru to the next with #4Cu bare or #6Cu in conductor.  Different electricians are suggesting different methods and the electrical inspector is unsure, but seems to be leaning towards the "special splice". Any feedback would be appreciated.
      
Had a Home Inspection (don't have the report yet.)  The house was built in 1983.  One thing the inspector said was a grounding wire should be put in from the panel in the garage to the outside box.



He also said I should have a new panel put in ($ 1,500-1,700).  That's a lot of money especially when you're just buying a house.  It sort of concerns me, but he didn't sound like it was urgent.



I can't believe I'd have to replace circuit breakers.  I'll get 3 estimates when I do this.



Is this a normal problem for houses this age?



I always think of my dad's 60 yr old house and he never once had a repairman.  I think his electrical was ancient.
      
I am installing central air conditioner in our 80 year old house. Debating between one high velocity system or two conventional systems.



We have 100 amp service with an electric dryer, stove and oven. Water and heat is gas.



The HVAC contractor told me that he spoke with the electrician who assured him that we would not need to upgrade service but add in a sub-panel.



Any thoughts?



What are the risks of staying with current electrical service and adding A/C? What are the risks of upgrading to 200 amp with such old wiring? Is one high velocity system better than two conventional systems?



Note I am cross posting based on another question I had in the HVAC forum.



Thank you in advance for all your help.