Can I throw a  standard 3 prong 110/120 receptacle on a 15A 2P 220v circuit? I need to run that 15A 2 pole 220 to a switch for central AC air handler service. I'd like to run to a switch with and outlet right next to it for service and still comply with NEC Code. This way, if service tech ever needs to plug a vacuum in or some other device, he'll have a something there. Is this possible or is that too powerful for 220v even though it's 15 Amps? Or should I just run a standard 15A 14/2 circuit.



Thanks



~S
      


Similar Tutorials

How to Lay Sod - The Right Way!
   - Make sure the green side faces up! And, there are a few more steps if you want to ensure a nice looking lawn. Prepa ...
The Difference Between Volts, Amps, and Watts
   - This article explains the difference between Volts, Amps, and Watts in an easy-to-understand non-scientific way. T ...
Water is Leaking from the Toilet – What do I do? (How to replace the wax seal for a toilet.)
   - If there is water leaking from the toilet, you need to make sure that you know from where the water is leaking. Che ...


Similar Topics From Forums

Hello again Gurus,



Will a double pole 15A 277v light switch work as a shut off for my air handler? I had to run all the electrical prior to them installing the central air and I wired a double pole switch from my 15A double pole breaker. I ran to the line/load ie black/white to the bottom posts on the switch. Thinking they can just run black/white from the air handler to the top. When the switch is UP> Live power to air handler. If it it's down (OFF), it means they can service the unit. Is my thinking correct on this? I couldn't find any other switches.



Thank You



~S
      
New appliances coming in. No change in service, so I believe that existing wiring can be considered grandfathered. Please correct me if wrong. BTW: we're under 2005 code in my locality, but I go with 2008.



Currently, the kitchen is wired all 15-amp except for non-counter-top receptacles. (I know, opposite, and wrong, but that's the way it is)





Can dishwasher and disposal be on same 15 amp circuit? (This will be a new circuit, so perhaps I need to run 20-amp?)


Current range wiring is 3-wire on a 40 amp breaker (3-pole). Can I still utilize a 3-prong receptacle here?


Does the kitchen wiring have to be upgraded to provide for 2 SABC (currently, only 1), and 20 amp?



      
If you have a 20 amp circuit going to your bathroom vanity, can you have two 20 amp receptacles on it, one a GFI receptacle and the other a standard 20 amp receptacle wired to the load terminals of the GFI receptacle ?



Or does the code require each receptacle to be a GFI on its own circuit ?



Arky
      
I have a 4 prong 220v outlet in my garage and would like to convert it to a 3 prong outlet for my welder and compressor.



Do I just put a wire nut on the neutral and tuck it back in the box?  Then install the new 3 prong outlet using the two hots and ground?



Thanks.
      
I have a 220v Microwave, and a 220v dryer, that came with a four prong plug cords attached (they were used in newer homes).



The current outlets are three prong outlets and there is absolutely no way to run new wiring.





Just need to change the cords on the microwave and dryer to the old style three prong ones?









Opinions?
      
Hello.



I recently purchased a home that has a a new grounded breaker panel but none of the outlets themselves are grounded save the hvac system in the basement. I had an electrician come and he said the fastest way to get it done is to switch the appropriate breakers to GFCI breakers in my service box and then I can change the outlets and then just put the stickers that say ungrounded etc on the new 3 prong receptacles. he called the inspector to double check and the inspector told him that he can't do it this way but he needs to find the first outlet in the loop from each breaker line and change that receptacle to a gfci and then we can change each receptacle to 3 prong in that loop.



Wouldn't just changing the breaker do the same thing? also if I did just install a Gfci receptacle on the first outlet in the loop, if it breaks wouldn't the rest of the outlets behind that gfci not function until I replaced the Gfci outlet where as a breaker would just pop and I can simply go turn it back on?



Just wanted to get some opinion from the experts as I'm willing to spend more on doing gfci breakers and am confused as to why the inspector suggested the way he did



Thanks for any help!
      
Appreciate any help with this.



Background:



- new to us old house, got three quotes for an upgrade to 200A service plus addition of three new circuits in conduit with receptacles (Chicago area, conduit is code in just about every town around, I have no issue with that);



- existing service to house was overhead, opted to keep it overhead and not bury it;



- the quote says, exactly: "Installation of a 200 amp 240 volt overhead electric service complete with riser, outdoor meter socket with a 200 amp disconnect, 40 position circuit breaker type distribution panel..." etc.;



I understood from discussing the work with the contractor we chose that install overhead service meant to include the work and materials needed to upgrade the line coming from the pole at the alley to the house to handle 200A capacity; paid 50% down on quote;



- the morning the boss and tech show up for the work, boss says we already have a 200A overhead, which I seem to recall the home inspector mentioning months ago before the closing (makes sense because the overhead runs to a single room addition put on several years ago), but boss was the guy who came to the house to quote the job in the first place, didn't mention anything about the existing overhead capacity at the time;



- the work gets done, seems fine; tech left without going over anything with us but whatever.



Final bill matches the quote to the dollar. There is no indication that there were any surprises during the work.



Since the quote says installation of overhead service and they didn't need to replace the overhead lines from the pole I think the final bill should be lower than the quote. The distance from the pole to the riser is about 40 feet.



Should I expect from the wording in the quote that the final bill should be lower than the quote because they didn't have to touch the existing overhead?



About how much lower?



We didn't go with the lowest quote, didn't beat him up on price and the total bill is quite a pretty penny, so I think he would be making good money either way.



I know there is no way for someone to tell me an exact dollar figure here based on a blog post, but I'd like to get some kind of idea so I can start my conversation about the final bill.



Thanks for any help out there.
      
Hello all,



My central air installer just called and said I need 15 Amp 208/230 circuit for the air handler we're getting. I ordered 2 pole 15 Amp breaker for my panel which happens to be Eaton. Myquestion:



Can still run 14/2 or does it need to be 12/2?



Thanks,



~S
      
i am replacing a meile washing machine (220V) to a new LG that is 110v

i want to convert the present 220 plug to make a 110 outlet.

can i just use the black, white and ground and cap the red?
      
Greetings,



I am looking to wire a sub-panel in my barn to support a general workshop.  Loads would include standard woodworking tools (including 220V table saw), welding, air compressor, etc.



The house has 200AMP main breaker and minimal in-house loads.  Dryer is gas, Oven and cooktop are gas.  Water heater is off the oil furnace.  I think the biggest single load is the well-pump and/or fridge compressor.  We do have sporadic toaster oven, hairdryers etc.  Otherwise its just lights, ceiling fans, flat-panel tv, stereo...



We had 4" conduit installed to the barn, so there is plenty of room to pull a big cable.  The entire run from the house panel to the barn totals around 155' (probably less, but rounding up)



My questions a



Can I pull a 100AMP sub-panel from my main house panel as described?


Would 4/0,4/0,4/0,2/0 aluminum service entrance cable be a good choice for this run?  Could I do it with something lighter?


Could I put an additional sub-panel in the garage (about halfway to the barn) by interrupting the run?  The garage subpanel would have a 220V plug for possible welding and/or electric car charging.  Would this require a separate run?


Are there any other considerations I should be thinking about in planning this?




Thanks for any thoughts you can share on this! 



Cheers,



pete