Service Cable From Meter To Load Center



Similar Tutorials

How to Lay Sod - The Right Way!
   - Make sure the green side faces up! And, there are a few more steps if you want to ensure a nice looking lawn. Prepa ...
The Difference Between Volts, Amps, and Watts
   - This article explains the difference between Volts, Amps, and Watts in an easy-to-understand non-scientific way. T ...
Water is Leaking from the Toilet – What do I do? (How to replace the wax seal for a toilet.)
   - If there is water leaking from the toilet, you need to make sure that you know from where the water is leaking. Che ...


Similar Topics From Forums

I have read and searched a bunch on wire size and I wondered if you guys could confirm that #2/0 copper is fine to run from the meter base to the panel.  Upgrading to 200 amp service, 200 amp base and 200 amp panel.  From what I gather its ok for service wires at 200 amps, but in other applications its rated for less.  For what its worth, the poco is running #4/0 to the the meter for the new service.
      
I am installing 200 amp residential service.  From the meter socket I am doing a very short run into the crawlspace to a 200 amp fused disconnect switch. From the disconnect switch I am doing a 60 foot run to the 200 amp panel. The run between the disconnect and the panel is all within the crawlspace interior ( heated ). Do I have to use ACWU cable or is there a cheaper alternative? I also need to isolate the bonding so is 4 wire configuration very common ?   This is a Canadian question specific to British Columbia codes.
      
I'm going to start my wiring for my addition this weekend.....



I'm going to be running at least half the ckts using THWN wire from the load center to a distribution box with terminal blocks in it.



The blacks and whites will be 12 AWG....can the ground be 14 AWG?  I've got a crap load of it and it would be nice to use up some of it.
      
My existing service entrance consists of an external Meter can mounted on the outside of the garage wall directly behind a SD Main Breaker Panel (MBP) with a 150 amp main breaker.  In order to support upgrades, I am installing a second MBP (200 amp) inside the garage in the wall cavity right next to the existing panel.



Local code requires that the upgraded Meter can be purchased from the City Utility.  I have already confirmed with the local inspector that either 4/0 Al or 2/0 Cu SE cable are acceptable for both the existing and new MBP.



My question is what is the code requirement for getting the 3 SE cables run from the dual lugs to the new panel?  Can those conductors run into the same wall cavity where the existing panel is installed?  If so, I'm certain they can't go through the same conduit nipple that connects the back of the meter can to the existing MBP.  Can they route in behind/above/below the existing panel and through a hole in the wall stud to gain access to the adjacent stud bay to get to the new panel?  If not, do they need to be routed out of the meter can on the external wall in conduit over to the next stud bay and then enter the wall there to gain access to the new panel?  If external conduit is required I would expect it must be metallic as opposed to PVC.



Best Regards,



Ted
      
We want to run 110V service to a portable building 95' from the breaker box at the house. It will run a 110V 8000 BTU AC (dedicated breaker), two single bulb light fixtures and 2 additional wall outlets. Our breaker box at the house is full, but I am being told I can remove a single breaker in the box and replace it with one that contains two breakers. What is the name of this type of breaker and where can I get one? What size breaker should be used for this amount of power requirement? What size breakers should I have in the load center on the portable building?
      
Hello All,



First post, working on a complete bare-stud remodel of my home, so I will try to be descriptive enough.  I have a 150 Amp service to the house (which I might upgrade later) with a meter socket and breakers outside.  I am running into the house (more than 10') to a 125 Amp 20 space ML.  I have too many 15 and 20 Amp circuits now for the panel and need to change it out.  The house is rather sprawling, so the rather than tie rooms together in a confusing way, I broke the circuits down per minimum requirements... almost none of them are near capacity.  I am going to run the big stuff back out to the exterior panel/service however I still need more space in my interior panel.  What I REALLY need is just a 40 circuit 125 Amp GE panel but I don't think those exist because (guessing) *most* 40 circuit scenarios need more amps.



What I wanted to do was upgrade to a 40 space panel (only been able to find a 200-Amp).  I realize I am still limited outside by the service and have already run 4/0 aluminum.  I know I am not going to go anywhere near the 200 Amp capacity, I just need the space.  Is this ok?  Any reason I shouldn't use a 200 Amp MB panel? 



Thanks!
      
Need a little advice... Here's the scenario:



-200 amp meter/main.

-2 small side by side residences with 80 amp load each.

-Each residence has a 200 amp panel with main disconnect.

-1 3" conduit from meter to underground pull box between both buildings

-A 2" conduit from the pull box to each building.

-All conductors to be 3/0



Is there any reason why a 3/0 feeder with ground could not be pulled to the

pull box and then split to run to each building instead of running 2 separate 100 amp feeders? Any other things to consider?
      
I have a grounding question.  I am installing 400a service to my new home.  We ran 350MCM wire underground thru 3" conduit from the 2ndary terminal (moped) to the house into a 320A Cooper B-Line meter.  From the meter we ran 2 sets of 4/0-4/0-2/0 thru the wall to 2-200a breaker panels ("standard practice", according to my electrical supplier).  The ground wire (#4Cu bare) from the grounding rods comes up from the ground and we're curious if there has to be a special splice connecting the ground wire to each breaker panel or can we run thru one breaker panel to then next, say by connecting the ground wire to a ground bus on one panel and running that thru to the next with #4Cu bare or #6Cu in conductor.  Different electricians are suggesting different methods and the electrical inspector is unsure, but seems to be leaning towards the "special splice". Any feedback would be appreciated.
      
I'm having quite the time finding an electrician who will quote this.  Just about all of them say that what I need is to upgrade my main panel but I want to install a new main panel that is a part of the meter base outside and make my current 100A panel a sub.   Maybe you people can tell me why nobody seems to want to do this.  Here are a few shots of the existing meter (note what is apparently a 60A base here)






and a shot of the conduit headed underground.  Like most homes built during this era, the conduit makes a right turn underground to enter through the cinderblock, ending up coming into the back of the main panel.  This conduit encloses a 4 wire feed. edit: no, actually it is only a 3 wire feed which is a problem if I want to convert the original main panel a sub.






Here's the existing panel.  It's a 60's era Square-D split panel with a 30 amp sub panel for the finished basement.  Those are low voltage wires to circuit taps for my home energy monitoring system btw.






The reason I don't want to upgrade this panel are as follows:

We won't be expanding the electrical west of this panel any more.  All planned expansion (240v car charger in Garage, planned 3 season room with grid tie Solar on the roof) will be to the east.


Upgrading the panel will require major surgery to the walls.  Due to the way the original basement is engineered there, the walls have an intricate stud pattern behind the existing panel.  I'd pretty much have to rip out a 4' section and redo it to make the access large enough to handle a 200A panel.


Adding additional circuits to an upgraded panel will require an act of God due to the finished basement construction.  There are no raceways for additional circuits.






Based on this, my thoughts were to create a new 200A main panel outside based on something like the GE model TSM420CSCUP loadcenter.  Here's a shot of this panel:






This particular panel has room for three 2-pole breakers in addition to the 200A mains.  I'd add a 100A 2-pole breaker for the existing panel, with the other two reserved for the garage/solar expansions.



The issue with the contractors who have quoted the job appears to be the conduit going to the existing panel.  I'm not sure what's wrong with it but it is apparently not compliant with current code.  Obviously the bonding needs to change, new grounding electrodes need to be driven, and a water pipe ground needs to be established to the new main panel, but what else is required?



I'd like to throughly research all the code considerations here so I can approach a contractor from a more knowledgable perspective then determine the best way to perform this upgrade.  Due to POCO coordination and the need to cut household power for the duration of the job, I have no desire to DIY this one...



So what exactly is wrong with the conduit running from the existing meter base to the existing load center?  Why is everybody telling me that I can't do essentially what I've described above?  What are the relevant code sections that will apply to this job?  Should I be chatting with my AHJ about local considerations now or should I wait until I have the code requirements down pat (assuming the latter here)?