I will be pulling from the breaker panel new 12/2 romex for a kitchen microwave and a 20 amp circuit, 12/2 for the garage. I might also pull some extra wire for a future add on room and to divide up existing circuits to avoid overloads in the future. I am snaking these cables through existing sheetrock ceilings and walls. Are there any code requirements about snaking through existing walls and ceilings other than drilling holes 2" from the face of a stud or beam?
      


Similar Tutorials

How to Lay Sod - The Right Way!
   - Make sure the green side faces up! And, there are a few more steps if you want to ensure a nice looking lawn. Prepa ...
The Difference Between Volts, Amps, and Watts
   - This article explains the difference between Volts, Amps, and Watts in an easy-to-understand non-scientific way. T ...
Water is Leaking from the Toilet – What do I do? (How to replace the wax seal for a toilet.)
   - If there is water leaking from the toilet, you need to make sure that you know from where the water is leaking. Che ...


Similar Topics From Forums

I'm having quite the time finding an electrician who will quote this.  Just about all of them say that what I need is to upgrade my main panel but I want to install a new main panel that is a part of the meter base outside and make my current 100A panel a sub.   Maybe you people can tell me why nobody seems to want to do this.  Here are a few shots of the existing meter (note what is apparently a 60A base here)






and a shot of the conduit headed underground.  Like most homes built during this era, the conduit makes a right turn underground to enter through the cinderblock, ending up coming into the back of the main panel.  This conduit encloses a 4 wire feed. edit: no, actually it is only a 3 wire feed which is a problem if I want to convert the original main panel a sub.






Here's the existing panel.  It's a 60's era Square-D split panel with a 30 amp sub panel for the finished basement.  Those are low voltage wires to circuit taps for my home energy monitoring system btw.






The reason I don't want to upgrade this panel are as follows:

We won't be expanding the electrical west of this panel any more.  All planned expansion (240v car charger in Garage, planned 3 season room with grid tie Solar on the roof) will be to the east.


Upgrading the panel will require major surgery to the walls.  Due to the way the original basement is engineered there, the walls have an intricate stud pattern behind the existing panel.  I'd pretty much have to rip out a 4' section and redo it to make the access large enough to handle a 200A panel.


Adding additional circuits to an upgraded panel will require an act of God due to the finished basement construction.  There are no raceways for additional circuits.






Based on this, my thoughts were to create a new 200A main panel outside based on something like the GE model TSM420CSCUP loadcenter.  Here's a shot of this panel:






This particular panel has room for three 2-pole breakers in addition to the 200A mains.  I'd add a 100A 2-pole breaker for the existing panel, with the other two reserved for the garage/solar expansions.



The issue with the contractors who have quoted the job appears to be the conduit going to the existing panel.  I'm not sure what's wrong with it but it is apparently not compliant with current code.  Obviously the bonding needs to change, new grounding electrodes need to be driven, and a water pipe ground needs to be established to the new main panel, but what else is required?



I'd like to throughly research all the code considerations here so I can approach a contractor from a more knowledgable perspective then determine the best way to perform this upgrade.  Due to POCO coordination and the need to cut household power for the duration of the job, I have no desire to DIY this one...



So what exactly is wrong with the conduit running from the existing meter base to the existing load center?  Why is everybody telling me that I can't do essentially what I've described above?  What are the relevant code sections that will apply to this job?  Should I be chatting with my AHJ about local considerations now or should I wait until I have the code requirements down pat (assuming the latter here)?
      
My existing service entrance consists of an external Meter can mounted on the outside of the garage wall directly behind a SD Main Breaker Panel (MBP) with a 150 amp main breaker.  In order to support upgrades, I am installing a second MBP (200 amp) inside the garage in the wall cavity right next to the existing panel.



Local code requires that the upgraded Meter can be purchased from the City Utility.  I have already confirmed with the local inspector that either 4/0 Al or 2/0 Cu SE cable are acceptable for both the existing and new MBP.



My question is what is the code requirement for getting the 3 SE cables run from the dual lugs to the new panel?  Can those conductors run into the same wall cavity where the existing panel is installed?  If so, I'm certain they can't go through the same conduit nipple that connects the back of the meter can to the existing MBP.  Can they route in behind/above/below the existing panel and through a hole in the wall stud to gain access to the adjacent stud bay to get to the new panel?  If not, do they need to be routed out of the meter can on the external wall in conduit over to the next stud bay and then enter the wall there to gain access to the new panel?  If external conduit is required I would expect it must be metallic as opposed to PVC.



Best Regards,



Ted
      
Hello,



can cables be run along the side of 2x4s which run along bottom of rafters? Sheetrock will be put up later on - attached to the 2x4s.

These are vaulted ceilings.



I know about the issue with nailing into cables in the walls and the requirement to install nail plates but how does this apply to the ceiling in this case (shown on attached picture)?



I'd like not to drill holes into the rafters to run the cables.



Will inspectors be ok with this?



Thanks
      
I completed my whole house rewire last Fall (took 2 years and severely tested my wife's patience). I read 5 wiring books in the early stages but read Rex Cauldwell's Wiring a House with his above code suggestions near the end of the project and now im obsessing about some of the stuff I didnt do. What do you guys think of some of the suggestions, specifically,



1. Driving 8 ground rods and the wire must be continuous (I drove 4 but the #6 copper wire from the panel to rod 1 is 1 wire and the #6 wire from rod 1 through rod 4 is another wire but both are properly clampled to rod 1 with an acord clamp). Funny, even with 4 rods there is almost no current through the rods versus 2-3 amps through the traditional cold water pipe ground



2. 1 circuit for each duplex receptacle in bathrooms. Since I have a quad in each of the batchrooms, that would be 4 circuits instead of 1 (code allows an unlimited number of bathroom receptacles on one circuit which does seem odd)



3. Nothing shared with kitchen counter receptacles (ie kitchen wall and dining room on their own)



4. Dedicated circuits for everything - I added dedicted circuit for fridge, microwave and dishwasher/disposer, but did not separate the dishwasher disposer onto 2 circuits. There used to be what I called "Circuit X" which did kitchen counter, microwave, dishwasher, disposer, fridge, 2 kitchen counter outlets, dining room and 1 outside outlet. Wife frequently blew that one. Circuit X was divided into at least 5 circuits during the rewire



5. No switch loops - did 5 of these to save on carpentry/avoid certain box fill problems. Now 2011 code says no switch loops without a neutral. Oops?



Just wondering what you guys think.
      
I have a 15 amp circuit feeding a bathroom and I want to upgrade it to a 20.  Can this be done without opening up the sheet rock walls and space between the first story ceiling and second story flooring?



It was wired, when it was code in the early 90's, with #14.  I am thinking that I could go from station to station and connect the end of the new 12 to the end of the old 14, and then pull it through BUT PERHAPS FOR STAPLING, assuming the cable is stapled every foot and a half.  If it is, and the run isn't too long, is it often possible to just tug on the cable to loosen the staples?



Assuming that can be done, do I have to open up the walls and ceiling to staple the new #12 cable to the framing. 



I am trying hard to avoid opening the drywall.  The newer paint in this particular room is impossible to match and I would have to repaint the entire room should I have to cut the wall.
      
Hello,  I have been scratching my head on this one for a while.



I have power from source to light with 14/2 then a 14/3 to power the second light and finishing off with a 14/2 to the switch.  Switch is the end of run.

My problem is id like to add a new light and switch tapping into the existing run.  My walls are not closed.  What is my best scenario to go about this.  I have never tapped into and existing line to make a new circuit.



Thank You

Any help is greatly appreciated
      
Hi everyone. I'm new here, so I hope I am not posting this in the wrong place.



Is there a good book or site with instructions and tips for running computer networking cable in the walls in existing construction? I did it in my former house, which was a one story Ranch house with a big crawlspace. It was very easy. But my current house is two stories on a slab. Not only can I not go under the house, but I need to get things to the second floor. I want network ports in at least six rooms, covering both floors and spanning the width of the house. I can put the patch panel in the coat closet in the middle of the house.



I want the end result to look as clean as possible. I'm not ok with cables running outside of the walls. I am expecting to have to cut and patch a lot of drywall, but I'm sure there are right and wrong ways to go about this project. And ways that will result in as little drywall cutting as possible. And what about running perpendicular to joists? Is it ok to drill holes that way? Even if I do, that would require cutting a hole in the ceiling every few feet I think. I hope there's a better way.



What resources should I read?
      
We are just beginning to start with our kitchen remodel. Today, I mapped out all the circuits and this is what I found.



Circuit # 7 - 20 amp circuit to 1 back splash outlet then to 3 kitchen wall outlets, then to a closet outlet and closet ceiling light and then to a side  porch light!



Circuit # 8 - 20 amp to Dishwasher and Disposal



Circuit # 9 - 20 amp circuit to microwave and kitchen ceiling lights. 2 patio recessed lights and dining room ceiling light.



Circuit # 12 - 20 amp circuit to another back splash outlet then to 2 dining room wall outlets.



Circuit # 14 - 20 amp to Refrigerator only



Circuit # 18 - 15 amp to GFCI outlet in garage then that feeds 3 outlets for 3 bathroom outlets and 1 outside patio outlet.



I going to have to add 1 more back splash outlet due to increase in counter space. I'll put the microwave on a dedicated circuit. So I need 2 additional breakers but I only have 1 blank spot in the breaker panel. I guess I can add one of those slim tandem breakers.



So my question, is it ok to have additional wall outlets on the same circuit as a back splash outlet?  If it's ok I'll lighten up circuit # 7 by putting some of those wall outlets on the additional back splash outlet.

Oh, I have 2 20 amp circuits I did not get identified yet! I'll get to those tomorrow.



thanks!
      
I have an older home and i wanted to add a new 15 amp breaker for a circuit for the outlets for my upstairs. I noticed that the existing old black romex runs from the circuit breaker in electrical conduit in my walls. There is no way i can get more romex through that conduit. Can i add the romex outside the electrical conduit? i am not really sure why they ran through the conduit to begin with.
      
I'm replacing my electric range with gas.  The electric has (I think) a four-wire #6 or #8 cable approx 60ft run with a 40a dual post breaker.  I say "I think" because the wire is behind everything else in the panel.  I see red/white/black wires, but no ground and I can't read the jacket.  Once I cut the main, i'll have a closer look. 



The gas range requires only a 15amp breaker. 

Can I simply replace the breaker with 15A and the 4 prong outlet with a Nema 5-15p?  I'd cap off both ends of the red wire.  Is there some sort of code that says I need to maintain the 40A circuit for a future stove?