200 Amp 200' Away
I am instaling a remote 200 amp meter base 200' from the shop what size wire do I need to run from the meter base to the shop?
- Similar Tutorials
How to Lay Sod - The Right Way!
- Make sure the green side faces up! And, there are a few more steps if you want to ensure a nice looking lawn. Prepa ...
The Difference Between Volts, Amps, and Watts
- This article explains the difference between Volts, Amps, and Watts in an easy-to-understand non-scientific way. T ...
Water is Leaking from the Toilet – What do I do? (How to replace the wax seal for a toilet.)
- If there is water leaking from the toilet, you need to make sure that you know from where the water is leaking. Che ... Similar Topics From Forums
I have read and searched a bunch on wire size and I wondered if you guys could confirm that #2/0 copper is fine to run from the meter base to the panel. Upgrading to 200 amp service, 200 amp base and 200 amp panel. From what I gather its ok for service wires at 200 amps, but in other applications its rated for less. For what its worth, the poco is running #4/0 to the the meter for the new service.
I am having a garage/shop built on my back lot. The PoCo will place a meter pan with a disconnect switch (not an OCPD) on a utility pole that is already in place and about 40 feet from the garage.
What will I need for temporary construction power? I know I need GFI receptacles and OCPD but what about the ground? Will I have to drive a rod?
I have 3 wire direct bury feeder cable from a 200 amp meter base/sub panel to a 125 amp sub panel on a post 150' away and the 125 amp sub panel will feed a 30 amp RV outlet box.
The 3 wire feed was already there and I know it is not to 2008 code, but my question is: do I need to bond the neutral bar to the ground bar and to a ground rod at the 125 amp subpanel?
I know this has been done to death but, just want to make sure that I headed in the right direction. O.K. I'm building a 12x16 shed and need to know what size wire to use. I plan on having lights, saws, mini fridge, deep freeze, air compressor and maybe a small a/c unit in the summer. I plan on having everything on different circuits like lights on 15A, fridge and freezer on 20A, have plugs on bench on 20A, air compressor on 20A, and mini a/c on 20A. I plan on using romex 14/2 for 15A and 12/2 for 20A. With sub panel http://www.homedepot.com/Electrical-...&storeId=10051 or something like it. My shed is about 30' from the meter loop. So, what size wire do I use from the meter loop 6/2????? Do I need to use a ground rod at the shed? Thanks for looken!!!!!
I'm having quite the time finding an electrician who will quote this. Just about all of them say that what I need is to upgrade my main panel but I want to install a new main panel that is a part of the meter base outside and make my current 100A panel a sub. Maybe you people can tell me why nobody seems to want to do this. Here are a few shots of the existing meter (note what is apparently a 60A base here)
and a shot of the conduit headed underground. Like most homes built during this era, the conduit makes a right turn underground to enter through the cinderblock, ending up coming into the back of the main panel. This conduit encloses a 4 wire feed. edit: no, actually it is only a 3 wire feed which is a problem if I want to convert the original main panel a sub. Here's the existing panel. It's a 60's era Square-D split panel with a 30 amp sub panel for the finished basement. Those are low voltage wires to circuit taps for my home energy monitoring system btw. The reason I don't want to upgrade this panel are as follows: We won't be expanding the electrical west of this panel any more. All planned expansion (240v car charger in Garage, planned 3 season room with grid tie Solar on the roof) will be to the east. Upgrading the panel will require major surgery to the walls. Due to the way the original basement is engineered there, the walls have an intricate stud pattern behind the existing panel. I'd pretty much have to rip out a 4' section and redo it to make the access large enough to handle a 200A panel. Adding additional circuits to an upgraded panel will require an act of God due to the finished basement construction. There are no raceways for additional circuits. Based on this, my thoughts were to create a new 200A main panel outside based on something like the GE model TSM420CSCUP loadcenter. Here's a shot of this panel: This particular panel has room for three 2-pole breakers in addition to the 200A mains. I'd add a 100A 2-pole breaker for the existing panel, with the other two reserved for the garage/solar expansions. The issue with the contractors who have quoted the job appears to be the conduit going to the existing panel. I'm not sure what's wrong with it but it is apparently not compliant with current code. Obviously the bonding needs to change, new grounding electrodes need to be driven, and a water pipe ground needs to be established to the new main panel, but what else is required? I'd like to throughly research all the code considerations here so I can approach a contractor from a more knowledgable perspective then determine the best way to perform this upgrade. Due to POCO coordination and the need to cut household power for the duration of the job, I have no desire to DIY this one... So what exactly is wrong with the conduit running from the existing meter base to the existing load center? Why is everybody telling me that I can't do essentially what I've described above? What are the relevant code sections that will apply to this job? Should I be chatting with my AHJ about local considerations now or should I wait until I have the code requirements down pat (assuming the latter here)?
I recently used a licensed electrical contractor to install a meter base and mast on my house. He gave me an estimate of $2600 and asked me for a deposit of half that before he would start working. I gave him that amount and he did the work. This week i received his final invoice of costs and the amount due is $2400. That is on top of the 1300 i already gave him. Therefore his estimate was wrong by almost 50%. I talked to him and he said there were no major problems that werent expected in his estimate. I am from Temagami Ontario and this is were the electrician is from and the work was done. Is there a legal limit on how wrong his estimate can be or am i stuck paying this ridiculous amount?
Thanks for any input or response.
Do I need to install the lugs in 320a meter socket
The guy who wired my shop didn't leave me any slack to be able to move the outlet around on the stud. I need to move it out and down some to add the drywall.
I added a little extension and pigtailed it in with the original wire. Is this acceptable? Is it within code? I'll post a pic. Do I just need to rewire with a longer wire instead of the extension? I don't know much about wiring so I appreciate any ideas.
My existing service entrance consists of an external Meter can mounted on the outside of the garage wall directly behind a SD Main Breaker Panel (MBP) with a 150 amp main breaker. In order to support upgrades, I am installing a second MBP (200 amp) inside the garage in the wall cavity right next to the existing panel.
Local code requires that the upgraded Meter can be purchased from the City Utility. I have already confirmed with the local inspector that either 4/0 Al or 2/0 Cu SE cable are acceptable for both the existing and new MBP. My question is what is the code requirement for getting the 3 SE cables run from the dual lugs to the new panel? Can those conductors run into the same wall cavity where the existing panel is installed? If so, I'm certain they can't go through the same conduit nipple that connects the back of the meter can to the existing MBP. Can they route in behind/above/below the existing panel and through a hole in the wall stud to gain access to the adjacent stud bay to get to the new panel? If not, do they need to be routed out of the meter can on the external wall in conduit over to the next stud bay and then enter the wall there to gain access to the new panel? If external conduit is required I would expect it must be metallic as opposed to PVC. Best Regards, Ted
wanted to get feeback on my crude wiring diagram i put together for my small bathroom remodel. does it appear to be sound or am i way off base??
details: * 20A dedicated circuit * 12/2 wiring * outlet's will be GFCI * double gang box will contain: * timer unit for exhaust fan * double switch for heat lamp and lights * Ground wiring is not shown but each fixture/outlet/switch will be connected to ground wire * by calculations, the 34cu box is fine for the number of conductors/size of wiring. per box specs could handle 15/12g wires. * the scanner cut off the bottom part of the picture, the 2 lights on the right are fed from the same switch, neutral's connected together. F = Exhaust Fan L = Light HL = Heat Lamp T = Timer switch S = Switch H = Hot N = Neutral Wire Nuts are in the box connecting the pigtails Thank you for your input. |