Metal Bar In Way Of Junction Box
I removed the light above my vanity and found that the the previous installer did not install a junction box. The house was built in 1985 so I think there should have been one. Anyway, there is a metal bar that is crossing the hole that conflicts with a new installation. I am prepared to cut this bar away to make room but I would like to know what it is before I create a new problem.
Does anybody have any idea what this is? And if I can cut it away without any regrets? The bar is shown in both of the attached photos. For background. This is an exterior wall. There is a stud located about 1" to the right of the existing cut out. There is a vent pipe on the left edge of the cutout. The metal bar appears to extend from the stud on the right generally in the direction of the stud on the left (outside of the photo). I have seen something like this as bracing for pipes in other locations of the house but in those cases they used copper pipe. Any suggestions would be appreciated. Derek Similar Tutorials
How to Lay Sod - The Right Way!
- Make sure the green side faces up! And, there are a few more steps if you want to ensure a nice looking lawn. Prepa ...
The Difference Between Volts, Amps, and Watts
- This article explains the difference between Volts, Amps, and Watts in an easy-to-understand non-scientific way. T ...
Water is Leaking from the Toilet – What do I do? (How to replace the wax seal for a toilet.)
- If there is water leaking from the toilet, you need to make sure that you know from where the water is leaking. Che ... Similar Topics From Forums
In a 1950s home the electrical is being redone. Wallboard was removed in the kitchen and there is a kitchen sink drain/vent line (seems to be 1" to 1-1/2" pipe) in the wall which is made of steel. It runs down into the concrete slab and up through the roof. There is an old electrical outlet (which will be removed and replaced) next to it which has a 14/2 cable and a separate small ground conductor running to it. With a meter I measure 50V between the steel pipe and the steel housing of the receptacle. Once the old receptacle is removed and a new one is installed, where and how will the drain pipe be grounded? I am sure there are more steel drain pipes used in this house but not all of them are open and exposed. Will it be sufficient to ground this one steel drain/vent line? If yes how and with what conductor size?
Our pool was installed 10 years ago and we need to change the 3 underwater lights because they are leaking. The cable for each light box goes through a conduit and up to a "deck Box" or junction box per code so water from pool can't run up to the box. In order to change the lights we need to locate the box and pull the wires out, then feed the wires through for the new light. The problem is that one of the boxes seems to be missing. That light sits under a stone waterfall and there is a planting area behind the waterfall. Ive searched under all the bushes and even done a bit of digging but cant find the box. I'm wondering if there is some smarter way to locate it.
I tried a metal detector but there were too many false alarms from every metal scrap the work men left behind. I was wondering if there is something that could be fed through the conduit to junction box that would send a signal allowing it to be located. I know the cesspool guys use something like that and thought maybe an electrician might have a similar tool. The new lights are completely different than the old ones so we can't just change out one. if we can;t change this light we can;t change any of them and the whole project goes down the drain. Any suggestion would be greatly appreciated.
I have 2" grey pvc conduit running from my basement underneath a patio and terminating vertically from the ground a few feet past the edge of the patio (in the dirt). I want to install an outlet on the stone wall at the edge of this patio. I do not know how to properly return the wire from that open 2" vertical conduit back to the wall a few feet away. I assume I need a junction box on the existing conduit, but can't find one with a 2" inlet. I would like to keep the connections buried if possible, return with a smaller conduit to the wall and up to a mounted outlet box (weatherproof). Any suggestions about how to manage the conduit connections from the vertical pipe?
Tom
Tearing out a wall cabinet uncovered a hole in the wall which I think I can install an outlet on. The problem is that the ground wires are to short to pull out far enough to attach to the outlet.
However, the box in the wall is metal, so there should still be an path to the ground from the outlet right? Or is there something special about the green screw on the outlet which makes that the only safe spot to attach the ground to? box I uncovered: https://lh3.googleusercontent.com/-v...s538/photo.jpg fuzzy picture of the inside of the box showing the ground being attached to metal box: https://lh6.googleusercontent.com/-B...303_154810.jpg The outlet I want to install... (although I dont know how to pick the right outlet based on the limited info on the wiring I have, so any help with that would also be appreciated): http://www.homedepot.com/Electrical-...&storeId=10051
My existing service entrance consists of an external Meter can mounted on the outside of the garage wall directly behind a SD Main Breaker Panel (MBP) with a 150 amp main breaker. In order to support upgrades, I am installing a second MBP (200 amp) inside the garage in the wall cavity right next to the existing panel.
Local code requires that the upgraded Meter can be purchased from the City Utility. I have already confirmed with the local inspector that either 4/0 Al or 2/0 Cu SE cable are acceptable for both the existing and new MBP. My question is what is the code requirement for getting the 3 SE cables run from the dual lugs to the new panel? Can those conductors run into the same wall cavity where the existing panel is installed? If so, I'm certain they can't go through the same conduit nipple that connects the back of the meter can to the existing MBP. Can they route in behind/above/below the existing panel and through a hole in the wall stud to gain access to the adjacent stud bay to get to the new panel? If not, do they need to be routed out of the meter can on the external wall in conduit over to the next stud bay and then enter the wall there to gain access to the new panel? If external conduit is required I would expect it must be metallic as opposed to PVC. Best Regards, Ted
In a previous thread (Wire suitable for underwater usage), I enquired about what cord types would be suitable for underwater usage because I was building a submersible fishing light to attract baitfish. Well, the light is done, and the bulb "farthest away" from the battery is by far the brightest in the chain (I hesitate to say chain since they are wired in parallel).
Attached image "photo 1" is a picture of the light I made. Notice the bulb all the way to the left is far brighter than the rest. All bulbs used are the same spec, and look like this: To wire the bulbs, I cut the flange off with a Dremel tool so that they would fit in the tube. Two pair of them have their terminals soldered together (neg to neg, pos to pos...that's the "gap" you see in the lighting), and the first bulb in line is upside down, with it's terminals facing the incoming wiring. The first bulb receives the wiring from the main line, then hookup wire is used to jump from those terminals to the next set, etc. There IS one anomaly with the final/far left bulb. When I was cutting off the flange, I accidentally cut too far on that piece, basically severing the terminals from the bulb. So, when wiring it into the circuit, I had to improvise and soldered the hookup wire directly into the solder points located on the bulb itself (instead of the underside). Hopefully you can see what I'm talking about in attached "photo 2." I have no idea why this anomaly would make the bulb brighter though. Can anyone think of any other reason the bulb would be brighter? Unfortunately, I cannot do any readings on the individual bulbs because I did not notice this until everything was soldered into place and the lamp sealed/waterproofed).
Hi all
I'm renovating a rental home I bought. It has the original 90 year old fuse panel and I'd like to replace it with a modern panelboard. Here's a picture of the current setup: I'd like to demo the inset fuse box cabinet and then mount a new panel on the wall to the left. The service conduit goes inside the stucco into the building. I'd like to cut it, put in junction box, and a sweep and extend the service to the left to the new panel I called our electric co. to get the power disconnected and strangely the rep told me "Oh, people usually just work on it hot". Is this true/feasible?? Your advice is appreciated
I was going to put this in this thread Junction box in stud wall behind drywall? but, decided to start a new one.
Two nights ago while sitting in my kitchen the can lights in my soffits above my cabinets suddenly went out. At first I thought my daughter or her boyfriend was messing with me and reached around the corner and flipped the switch. Nope. Tried the other switch near me and nothing. Everything else in the kitchen worked. Thinking tripped breaker for a moment...nope other lights work on the circuit. Can't be 6 CFL's burnd out at the same time. Hmmmmm? Background: Kitchen was remodeled 12 years ago. Drywall was in good shape so not removed. Added circuits for Fridge, Microwave, Garbage disposal, Stove (gas),Dishwasher, range hood, and countertop recepts. None of these are tied to lights. Original task lighting was 4' tubes over countertops above cabinets. Remodel added sofits and can lights from these two feeds Started tracing circuit path to look for loose/broken wire. Found no power at lights. Checked power at breaker...Good. Follow wire to kitchen, no junctions. Wire disapears up into wall below the switch area. Check for power at switch box. Yep, power there. Power off and pigtail Neutral/hot wires at a can light together. No continuity on the load side of the switch circuit. Broken wire somewhere between the switch and the lights. Fortunaly there is an attic space above the kitchen. Unfortunatly, it is a short headroom ~3' or less and full of blown ihn insulation. In I go to trace the wire. after about 10 min up there I found the burried junction box. At some time in the past there used to be a single light in the center of the "U" shaped kitchen cabinets. This was abandoned and the box was drywalled over...still in the location for the light hookup so the cover was not readily accessable. found a tightly twisted Ground, Neutral and Hot with nuts. All looked good untill I Started messing with them. found that one of the hot leads had broken right at the insulation on the wire. Looking at it closer I could see some arc burn at the break. I am thinking that when the handy hack that did the job nicked the wire he did not know or care and tristed it together anyway. It took over, to my best guess, 20 years for it to fail. Moral... It can happen
Hi guys. I'm Dan, and I'm in Knoxville, TN. I know running power to a shed is a very common topic here. I've been doing tons of reading and feel pretty comfortable with the requirements, but I have two questions I haven't been able to find a clear answer to.
First, my situation: I'm having a 10x16 shed built in my backyard, to be used primarily as a woodshop. I need more than a single circuit, so I know I need a subpanel and two grounding rods at least 6' apart, bonded to the subpanel with #6 bare copper wire. My house has 200 amp service, and the main panel is in the garage at the opposite corner of the house from where the shed will go, so it would be pretty inconvenient to run a feeder from, there. But there's an existing 100 amp subpanel in the basement, presumably installed when the previous owner finished the basement. I'll be running a 60 amp feeder from that subpanel to the shed. My total run will be something like 75', so I'm running #6 THWN for the two hots and neutral, and #10 THWN for the ground. I plan to bury it in 1.25" schedule 40 PVC, buried 18" deep. My first question relates to how I need to run the wire when it's not underground. The basement is finished with a drop ceiling, so I plan to run the feeder across the drop ceiling, out of the house, down to the ground (it's a walk-out basement), then underground the 26' to the shed. I assume it still needs to be in conduit for at least the part that runs up the wall of the house. But what about inside, when it runs through the drop ceiling to the panel? Does it need to be in conduit for the whole run? Or would I just staple the four wires to the joists or something? The other question relates to the trench. I've got a rain gutter downspout that discharges right at where the shed will soon be, so I'm running a 40' length of 4" PVC to pipe that water past the shed. It will be buried just about 6-12", just enough to run under the shed. Can I run the power conduit in the same trench (obviously, deeper)? Presumably I'd dig the 18" trench to the shed, lay the schedule 40, then add a few inches of dirt to bring it up to about 12" deep, and extend the trench past the shed at that depth, then lay the 4" drain pipe and backfill. Or do I need to dig two separate trenches? Is there a rule about how far apart they need to be if so? If anyone sees any other flaws or concerns with my plan, please do speak up, I want to do this right. Thanks! Dan
Help! We decided to raise the ceiling in our kitchen for some new taller cabinets. We have 30" cabinets with a 7' drop ceiling. By taking out the drop ceiling we can go to an 8' ceiling with 36" cabinets. We just had the ceiling taken out and now I see I got a problem!
This is a 2 story home, the wall in question is a load bearing wall (runs through the center of the house) The main breaker panel is in this wall (the panel opening is in the adjacent family room) As you can see in the photos I cannot extend the wall up because all of the home wiring is in the way! I expected I might have to run longer wires but not this. Some ideas we've thought about... notch the double 2x4s (not sure how much I need to notch or allowed to) build a cove (box) and leave the wires like they are (might be an eyesore in our new kitchen) put up a large crown moulding along the entire wall (would be the only crown moulding in the house) extend the ceiling up 6-7" instead of 12" (should leave enough room for wire to stay) I'm leaning to the notching option if I can find a way to reinforce that section. Any ideas? thanks! |